KiwiRail Bridge 105, Otaio >>
KGA provided temporary works design to McConnell Dowell for a Mechanically Stabilised Earth embankment. The embankment was required to support the track bed until the existing bridge was removed and the permanent embankment could be completed. As well as the train loadings, the design also had to take into account possible scour effects.